How To Place A Side Drain In A Storm Gutter System?
There is no single way to install a duct system for the collection and evacuation of rainwater from the roof. The most common are those in which the downspouts are placed in the middle of the gutters and side drain assemblies, in which the vertical pipes are placed at the end of the gutter. In this post we are going to review how to install the second option, with a step-by-step process for assembling the gutters and the side drain.
Choose the type of ducts
The first thing we must do in any gutter installation is to
choose the materials and characteristics of the gutters. To do this, we must
first find out about the peculiarities of each type of duct, the most common
are:
Aluminum gutters.
Zinc gutters.
Galvanized gutters.
Copper gutters.
Once we have decided on the material with which we are going
to work, it is necessary to know the rainfall rate of the place where the
construction is located and the measurements of the roof , as well as its
inclination. With these data we can also make a decision about the diameter of
the rain gutters.
Calculate the slope of the
installation
After choosing the ducts, it is time to start the assembly
and this is where one of the peculiarities of lateral downspout installations
comes into play. We must install the horizontal ducts with an inclination of at
least 0.5% towards the downspout .
This requirement is fundamental, since otherwise it is very
likely that water will accumulate and we will be favoring the formation of
obstructions with all the problems that they entail for the installation. In
addition, this inclination also allows gutter
maintenance to be easier, since the cleaning of the channels can be carried
out more quickly.
Place the supports
It is important to calculate the exact places where we are
going to put the duct fasteners to ensure that we comply with the necessary
inclination in the installation. On the other hand, it is also essential not to
leave more than 50 cm between each support . In this way we will be securing
the system in case it has to support a lot of weight.
You will have to choose the type of supports depending on
whether the assembly is done on the facade, under the roof, on the eaves of the
building, etc. Be sure to consult with a professional which is the best option.
Put the gutters in place
Once the supports have been placed, we have to put the
gutters in their final place and fix them . In this type of installation with a
side drain, it is possible to put a piece at the end that includes the sides
and an opening to fit the downspout. In this way it is much easier to carry out
the assembly to drain rainwater.
Install the downspouts
If you have used a specific part for mounting rain gutters
with drainage, you will only have to assemble the vertical duct and then fix it
to the facade . Depending on the characteristics of the construction, you may
also need to place an elbow or some other accessory.